Republic of the Philippines 0920 969 6020 municipalityofbongabong@gmail.com Emergency hotlines

Citizen's Charter

Delivering efficient, transparent, and accessible public services to every citizen of Bongabong, Oriental Mindoro.

Handbook 2026 · 1st Edition26 offices · 261 services

Services Directory

Complete list of frontline services of all offices and departments. Open an office, then press Details to see the requirements, steps, fees and processing time.

26Offices / Departments
261Total Services
20261st Edition

Showing 1 of 26 offices — click an office to expand its services

Municipal Engineering Office

7 External Page 123

External Services

  1. 1 Application for Building Permit Details
  2. 2 Application for Certificate of Occupancy Details
  3. 3 Application for Demolition Permit Details
  4. 4 Application for Sign/Signage Permit Details
  5. 5 Application for Fencing Permit Details
  6. 6 Application for Excavation and Ground Preparation Permit Details
  7. 7 Request For Road Maintenance/Improvement Details

Municipal Building, Poblacion, Bongabong

2. APPLICATION FOR CERTIFICATE OF OCCUPANCY

After construction is completed, the building undergoes final inspections by the Office of the Building Official and other concerned authorities to verify compliance with approved plans, safety codes, and regulations. Any deficiencies are corrected, and once all requirements are satisfied, the building is allowed for occupancy.

Office/Division:Municipal Engineering Office
Classification:Simple / Complex
Type of Transaction:G2C (Government to Citizen), G2B (Government to Business), G2G (Government to Government)
Who may avail:The owner/s of newly constructed/renovated/repaired building or structure, provided that such building or structure is located or situated within the Municipality of Bongabong.
Checklist of RequirementsWhere to Secure
Certificate of Completion (Civil, Mechanical, Electrical and Sanitary/Plumbing Permits)Second Floor of the Old Municipal Building, Office of the Municipal Engineer, Building Permit Section
Logbook of building construction and Building Inspection Sheet duly accomplished by the contractor (if undertaken by contract) and signed and sealed by the architect or civil engineerProfessional In charge of construction
1 photocopy of PTR & PRC license ID of all Engineers or Architects who will sign and seal the Certificate of Completion form front, sides and back with PerspectiveProfessional In charge of construction
Certificate of Final Electrical InspectionProfessional In charge of construction
Final Fire Safety Inspection ReportBureau of Fire Protection
As-Built Plans (if there are changes in the approved plans) signed and sealed by respective Engineers and Architect and signed by owner/applicant (Architectural, Structural, Plumbing/Sanitary, Electrical, Mechanical, Electronics)Professional In charge of construction
Client StepsAgency ActionFeesProcessing TimePerson Responsible
1. Secure and fill out the Application Forms for the Certificate of Occupancy.

1.1 Issue Application Forms with list of requirements.

None 5 minutes

Armin Mangarin (Construction and Maintenance, CAPATAZ, OBO Liaison Officer)

2. Submit the duly accomplished forms and related documents, safety certificates, as-built plans (for any alteration of the Sketch of location to the one in-charge of receiving).

2.1 Receive and check completeness of application documents based on the checklist of requirements.

2.1.1 If complete, issue acknowledgement receipt.

2.1.2 If incomplete, issue notice of incomplete documents with a checklist of lacking document/s.

2.2 Review the forms and the entries of construction activities in the construction logbook.

2.3 Inspect the completed building/structure in accordance with the approved plans and specifications.

2.5 Evaluation of Building Plans and other supporting documents.

2.6 Issue an inspection report that lists the needed corrections, alterations or other documents required, if any.

None 30 min / 30 min / 2 days / 1 day / 1 hour

Anita T. Famisaran (Administrative Aide VI)

Engr. Kyell Adam G. Francisco (Bldg. Inspector)

Engr. Airene Dipasupil (Electrical Inspector)

Joven Villanueva (Electrical Inspector)

Engr. Olivia C. Coronel (MENRO / Acting Municipal Engineer or Building Official)

3. Re-submit the revised documents as per inspection.

3.1 Conduct re-inspection of the building in consideration of the inspection report. Check if the deficiencies stated in the inspection reports are corrected.

3.2 Evaluation of Building Plans and other supporting documents.

3.3 If compliant, assess total fees and issue order of payment.

None 1 day / 1 day / 1 day

Engr. Kyell Adam G. Francisco (Bldg. Inspector)

Engr. Airene Dipasupil (Electrical Inspector)

Joven Villanueva (Electrical Inspector)

Engr. Olivia C. Coronel (MENRO / Acting Municipal Engineer or Building Official)

Anita T. Famisaran (Administrative Aide VI)

4. Pay the prescribed fees as computed.

4. Receive payment and issue Official Receipt (O.R.)

As per assessment 5 minutes

Cashier I, Municipal Treasurer's Office

5. Receive O.R. and return to the Office of the Municipal Engineer.

5.1 Endorse Official Receipt to Printing and Recording Section.

5.2 Endorse printed Certificate of Occupancy to OBO for approval/signature.

None 5 minutes / 5 minutes

Armin Mangarin (Construction and Maintenance, CAPATAZ, OBO Liaison Officer)

Building Official / Municipal Engineer

6. Receive the Approved Certificate of Occupancy.

6. Release Certificate of Occupancy to client with Official Receipt (O.R.)

Refer to NBCDO Memorandum Circular No. 03 Series of 2016 5 minutes

Building Official / Municipal Engineer, Office of the Municipal Engineer

TotalRefer to NBCDO Memorandum Circular No. 03 Series of 20163 days (Simple), 7 days (Complex)

Steps

Step 1: Secure and fill out the Application Forms for the Certificate of Occupancy.

Agency action

1.1 Issue Application Forms with list of requirements.

FeeNone
Time5 minutes
Person responsible

Armin Mangarin (Construction and Maintenance, CAPATAZ, OBO Liaison Officer)

Step 2: Submit the duly accomplished forms and related documents, safety certificates, as-built plans (for any alteration of the Sketch of location to the one in-charge of receiving).

Agency action

2.1 Receive and check completeness of application documents based on the checklist of requirements.

2.1.1 If complete, issue acknowledgement receipt.

2.1.2 If incomplete, issue notice of incomplete documents with a checklist of lacking document/s.

2.2 Review the forms and the entries of construction activities in the construction logbook.

2.3 Inspect the completed building/structure in accordance with the approved plans and specifications.

2.5 Evaluation of Building Plans and other supporting documents.

2.6 Issue an inspection report that lists the needed corrections, alterations or other documents required, if any.

FeeNone
Time30 min / 30 min / 2 days / 1 day / 1 hour
Person responsible

Anita T. Famisaran (Administrative Aide VI)

Engr. Kyell Adam G. Francisco (Bldg. Inspector)

Engr. Airene Dipasupil (Electrical Inspector)

Joven Villanueva (Electrical Inspector)

Engr. Olivia C. Coronel (MENRO / Acting Municipal Engineer or Building Official)

Step 3: Re-submit the revised documents as per inspection.

Agency action

3.1 Conduct re-inspection of the building in consideration of the inspection report. Check if the deficiencies stated in the inspection reports are corrected.

3.2 Evaluation of Building Plans and other supporting documents.

3.3 If compliant, assess total fees and issue order of payment.

FeeNone
Time1 day / 1 day / 1 day
Person responsible

Engr. Kyell Adam G. Francisco (Bldg. Inspector)

Engr. Airene Dipasupil (Electrical Inspector)

Joven Villanueva (Electrical Inspector)

Engr. Olivia C. Coronel (MENRO / Acting Municipal Engineer or Building Official)

Anita T. Famisaran (Administrative Aide VI)

Step 4: Pay the prescribed fees as computed.

Agency action

4. Receive payment and issue Official Receipt (O.R.)

FeeAs per assessment
Time5 minutes
Person responsible

Cashier I, Municipal Treasurer's Office

Step 5: Receive O.R. and return to the Office of the Municipal Engineer.

Agency action

5.1 Endorse Official Receipt to Printing and Recording Section.

5.2 Endorse printed Certificate of Occupancy to OBO for approval/signature.

FeeNone
Time5 minutes / 5 minutes
Person responsible

Armin Mangarin (Construction and Maintenance, CAPATAZ, OBO Liaison Officer)

Building Official / Municipal Engineer

Step 6: Receive the Approved Certificate of Occupancy.

Agency action

6. Release Certificate of Occupancy to client with Official Receipt (O.R.)

FeeRefer to NBCDO Memorandum Circular No. 03 Series of 2016
Time5 minutes
Person responsible

Building Official / Municipal Engineer, Office of the Municipal Engineer

Total3 days (Simple), 7 days (Complex) | Refer to NBCDO Memorandum Circular No. 03 Series of 2016

Municipal Government of Bongabong

Foreword

A message from the Municipal Government of Bongabong

It is with great pride and deep sense of public service that we present the Municipal Government of Bongabong Citizen's Charter Handbook 2026 (1st Edition) — a comprehensive guide to the frontline services offered by the various offices and departments of the local government.

This handbook has been prepared in compliance with Republic Act No. 11032, also known as the Ease of Doing Business and Efficient Government Service Delivery Act of 2018, which mandates all government agencies to regularly update and post their Citizen's Charter to promote transparency, accountability, and efficiency in public service delivery.

The Citizen's Charter is our formal commitment to our constituents. It sets out the services we offer, the requirements we need from you, the fees to be paid, the time it takes to process your transactions, and the steps you need to follow. It also outlines your rights as a citizen and the standards of service you should expect from us.

We recognize that quality public service is the hallmark of good governance. This handbook reflects our unwavering dedication to serve every Bongabongeño with honesty, efficiency, and compassion. We aim to make every transaction simple, fast, and hassle-free.

We encourage all our constituents to familiarize themselves with this handbook. If you encounter any difficulty in availing our services or if a government employee fails to meet the standards prescribed herein, please do not hesitate to reach out through our feedback channels.

Together, let us build a Bongabong that is progressive, peaceful, and truly responsive to the needs of its people.

THE MUNICIPAL MAYOR
Municipal Government of Bongabong
Oriental Mindoro, Philippines
2026

Official seal of the Municipality of Bongabong

Municipal Government of Bongabong
Oriental Mindoro, Philippines
1st Edition — 2026

Our Vision

The Center of Organic Farming in Oriental Mindoro

“A community with God loving, well informed, healthy, self-reliant, gender responsive, empowered and vigilant citizenry, who lived in a balanced, attractive and safe environment, and a globally competitive sufficient, disaster and climate resilient, gender responsive, diversified and environment-friendly economy, under a firm, decent, steadfast, progressive leadership with strong public-private partnership”.

Our Mission

  1. A transparent, just and participative governance with efficient and competitive public servants working together with the civil society for a self-reliant community.
  2. A municipality where its community members are safe and secured, morally upright, academically competent, healthy and economically productive ensuring the realization of an empowered Agri-based community.
  3. An accelerated economy anchored on and sustained through agri-tourism and engaged in different business enterprises.
  4. An ecologically balanced and hazard-protected habitat supporting the aspirations of the community.
  5. A municipality where its staffing pattern are humble, discipline, dedicated, morally upright, academically competent responsible and God-fearing ensuring the realization of programs and strategies that will increase the outcome of health, education, income, agriculture, transportation, social protection, peace and order, tourism and other services.

Service Pledge

“We, the officials and employees of the Municipal Government of Bongabong, pledge to deliver quality public services with utmost integrity, efficiency, and courtesy. We commit to upholding the rights of every citizen under the Anti-Red Tape Act (RA 9485) and the Ease of Doing Business Act (RA 11032). We shall respond to all requests and transactions within the prescribed processing time and treat every individual with dignity and respect.”

List of Offices

Where to find each office, and how to reach it. Tap a number to call.

OfficeAddressContact information
Office of the Municipal Mayor Executive/Legislative Building, Poblacion, Bongabong 0952 453 0799, municipalityofbongabong@gmail.com
Sangguniang Bayan / Office of the Vice Mayor Ground Floor, Executive/Legislative Building, Poblacion, Bongabong 0968 689 4708, sbofficebongabong@gmail.com
Municipal Health Office Bagong Bayan II, Bongabong, Oriental Mindoro 0995 434 7929, mhobongabong@gmail.com
Municipal Agriculture Office 2nd Floor, Municipal Building, Poblacion, Bongabong 0939 931 8022, 043-738-3855, maobongabong@gmail.com
Municipal Social Welfare and Development Office Ground Floor, Municipal Building, Poblacion, Bongabong 0951 573 9696
Municipal Disaster Risk Reduction and Management Office Sitio Panlanao, Brgy. Sagana, Bongabong, Oriental Mindoro 0966 359 6385, mgob.drrmo@gmail.com
Municipal Engineering Office Municipal Building, Poblacion, Bongabong
Municipal Civil Registrar Office Ground Floor, Municipal Building, Poblacion, Bongabong 0917 850 3370, mcrbongabong@gmail.com
Municipal Assessor's Office Municipal Building, Poblacion, Bongabong
Office of the Municipal Treasurer Municipal Building, Poblacion, Bongabong
Business Permits and Licensing Office 0917 772 5618, bplobongabong2025@gmail.com
Municipal Economic Enterprise and Cooperative Development Office 2nd Floor, New Wet Public Market, Poblacion, Bongabong 0921 455 3237, meecdobongabong@gmail.com
Municipal Environment and Natural Resources Office Sagana, Bongabong, Oriental Mindoro Menrobongabong2017@gmail.com
Traffic Management Office 2nd Floor, Public Market, Poblacion, Bongabong 0927 427 3506, tmobongabongormin@gmail.com
Bongabong Manpower and Development Center Sitio Panlanao, Brgy. Sagana, Bongabong, Oriental Mindoro 0916 556 9607
Municipal Budget Office 2nd Floor, Municipal Building, Poblacion, Bongabong mgob.budget@gmail.com
Municipal Accounting Office Ground Floor, Municipal Building, Poblacion, Bongabong 0906 472 6685, acct.lgubongabong@gmail.com
Human Resource Management Office 2nd Floor, Municipal Building, Bongabong, Oriental Mindoro 0963 783 2640, hrmobongabong@gmail.com
Bids and Awards Committee Office Poblacion, Bongabong, Oriental Mindoro 0927 879 0126, bac_lgubong@gmail.com
General Services Office 1st Floor, Municipal Building, Poblacion, Bongabong 0995 074 5762, lgubongabonggso@gmail.com
Internal Audit Unit Ground Floor, Municipal Building, Poblacion, Bongabong 0916 246 7093, iaubongabong@gmail.com
Public Employment Service Office Municipal Building, Poblacion, Bongabong
Municipal Planning and Development Office 2nd Floor, Municipal Building, Poblacion, Bongabong 0917 652 3988, mpdobongabong20@gmail.com
Local Economic Development and Investment Promotions Office 2nd Floor, Municipal Building, Poblacion, Bongabong 0965 120 2490, ledipobongabong@gmail.com

Feedback & Complaints

We value your feedback and are committed to improving our services.

How to send feedback?

Feedback Drop Box

Fill out the feedback form and drop it in the Feedback and Complaints Drop Box at the Municipal Hall.

Facebook Page

Bongabong Public Information Office Official Facebook Page

Online Survey

Access the online feedback form

Phone Call

+63920-969-6020 (Public Information Office)
+63963-783-2640 (HRMO Bongabong)

How to file a complaint?

To file a formal complaint, submit a letter addressed to:

AREANE JAZZEL G. BENJAMIN, CPA
Administrative Officer V / HRMO III
Human Resource Management Office

Your letter must include:

  • Full name and Contact Information of the Complainant
  • Sex (Male or Female)
  • Narrative/Details of the complaint
  • Evidence
  • Name of the person/office being complained

How feedback is processed?

All feedback requiring answers are forwarded to the concerned head of office for appropriate action.

How are complaints being processed?

All complaints are acknowledged and acted upon within five (5) working days.